CHANGE ORDER
Pleasure Craft
Current Position
Longitude | -118.17659° |
---|---|
Latitude | 33.72425° |
Status | Default |
Speed | 6 Knots |
Course | 88.9° |
Area | North Pacific Ocean |
Station | T-AIS |
Position Received | 2024-04-06 20:02 |
Info
Information
The current position of CHANGE ORDER is in North Pacific Ocean with coordinates 33.72425° / -118.17659° as reported on 2024-04-06 20:02 by AIS to our vessel tracker app. The vessel's current speed is 6 Knots and is currently inside the port of LOS ANGELES.
The vessel CHANGE ORDER (MMSI: 338404472) is a Pleasure Craft It's sailing under the flag of [US] USA.
In this page you can find informations about the vessels current position, last detected port calls, and current voyage information. If the vessels is not in coverage by AIS you will find the latest position.
The current position of CHANGE ORDER is detected by our AIS receivers and we are not responsible for the reliability of the data. The last position was recorded while the vessel was in Coverage by the Ais receivers of our vessel tracking app.
Weather
Temperature | 14.2°C / 57.56°F |
---|---|
Wind Speed | 6 knots |
Direction | 192° SSW |
Pressure | 1023.9 hPa |
Humidity | 46.7 % |
Cloud Coverage | --- |
Featured Company
Last Port Calls
Port | Arrival | Departure | Time In Port |
---|---|---|---|
LOS ANGELES | 2024-04-06 20:02 | ||
LOS ANGELES | 2024-04-06 15:00 | ||
LOS ANGELES | 2024-03-09 22:04 | 2024-03-09 22:05 | 0 m |
LOS ANGELES | 2024-03-09 17:50 | 2024-03-09 18:11 | 21 m |
Most Visited Ports (Last year)
Port | Arrivals | |
---|---|---|
LOS ANGELES | 8 |
Last Trips
Origin | Departure | Destination | Arrival | Distance | |
---|---|---|---|---|---|
LOS ANGELES | 2024-04-06 08:00 | LOS ANGELES | 2024-04-06 13:02 | 7.51 nm | |
LOS ANGELES | 2024-03-09 10:11 | LOS ANGELES | 2024-03-09 14:04 | 8.70 nm | |
LOS ANGELES | 2023-12-27 07:59 | LOS ANGELES | 2024-03-09 09:50 | 0.37 nm |
Events
Time | Event | Details | Position / Dest | Info |
---|